SLICKSHOP Update
Posted: September 21, 2010, 9:44 pm
Thought it was time to take a break and give everyone an update on the progress of my SlickShop (1,800 square feet clear span with 10' ceiling). My buddy and I have been working almost non-stop since SlickStock to get it ready to move trucks in and get to some serious work. I threw the landlord's workers out a week before SlickStock and told him we would finish it up. Slowest people in the world and sloppy isn't the word. He offered to pay for all the materials and deduct for our labor from the rent. Thank goodness for my buddy Whitney (who is as Anal-Retentive as I am) who did the majority of the wiring, including: Twelve 110 four-outlet boxes and four 110 two outlet boxes and two single 220 outlets all in conduit. Won't have to look far to plug something in. Here's a quick tour:
Overhead Entrance Door (Walk through door will be cut behind were the ladder is standing.)

Moving around the room. Eight foot door (probably barn door style) to the 16’X24’ storage room which will become paint booth, will be cut on the wall where the fan and yellow trash can is.

Built the workbenches, found the drawers at a salvage yard. Brien (Bluebolt) scored the Citgo pump island signs for me which now contain florescent lights. Just have to hang them.

He also scored the two 4'X8' rolling tables.

Refreshment Center (toilet and shower will go in the small room)

Office/Relaxation Area. High speed internet access. The couch? Us old guys sometimes need an afternoon nap
.

Welding and Compressor Room. Bluebolt scored welding table. New Eastwood MIG welder, Hobart Plasma cutter and Eastwood Combo Media/Soda Blaster. Room is lined with many heavy sheets of 5/8” “fire-rated” sheet rock. Plan is to cover walls with sheets of metal when I can find/afford it.

Proud owner, who is glad it’s finally time to move in (don't know why he's not smiling). It’s been a long three months with lots of back-breaking work.

Here’s what it looked like when I rented the space.

Couple of shots of what it looked like after it was cleaned out and the floor painted. Removed the stairs and the two 4X4 posts. Covered the ceiling with foam board and hung new 8’ lights. Added insulation and many, many sheets of sheet rock.


Tomorrow is the official move-in day. We'll be taking the crew cab and the 63 Uni over tomorrow and get them positioned and then take the 63 F250 over later this week for brakes, then it will come back to the house garage and we'll take the 61 BBW Uni over to get in line on the project list.
First order of business will be to remove the front clip and the bed from the crew cab so I can see what I have to deal with. As I've upped the anti by committing to driving my crew cab to SlickStock V I've got to get to some serious work.
First priority is to finish up the 63 Uni and get it drivable and stoppable, breaks on the f250 so it's stoppable and then on to the crew. For the first time I will be able to move from project to project without having to move something out of the garage and move something in. I'm close to a deal so I'll have convenient access to a fork lift which will aid in removing beds, cabs, etc.
And did I say that it's air conditioned and heated? And the utilities are included in the rent?
It's been a lot of work and has taken much longer than I had anticipated, but I now have a really nice. well-equipped shop and now have no excuses not to get busy and get these projects going. Then I can buy more Slicks.
I am one lucky son-of-a-gun.
Stay tuned for details on the upcoming "Shop Warming" a little later on in the year, when hopefully, the weather cools a bit. Y'all come!
Overhead Entrance Door (Walk through door will be cut behind were the ladder is standing.)

Moving around the room. Eight foot door (probably barn door style) to the 16’X24’ storage room which will become paint booth, will be cut on the wall where the fan and yellow trash can is.

Built the workbenches, found the drawers at a salvage yard. Brien (Bluebolt) scored the Citgo pump island signs for me which now contain florescent lights. Just have to hang them.

He also scored the two 4'X8' rolling tables.

Refreshment Center (toilet and shower will go in the small room)

Office/Relaxation Area. High speed internet access. The couch? Us old guys sometimes need an afternoon nap

Welding and Compressor Room. Bluebolt scored welding table. New Eastwood MIG welder, Hobart Plasma cutter and Eastwood Combo Media/Soda Blaster. Room is lined with many heavy sheets of 5/8” “fire-rated” sheet rock. Plan is to cover walls with sheets of metal when I can find/afford it.

Proud owner, who is glad it’s finally time to move in (don't know why he's not smiling). It’s been a long three months with lots of back-breaking work.

Here’s what it looked like when I rented the space.

Couple of shots of what it looked like after it was cleaned out and the floor painted. Removed the stairs and the two 4X4 posts. Covered the ceiling with foam board and hung new 8’ lights. Added insulation and many, many sheets of sheet rock.


Tomorrow is the official move-in day. We'll be taking the crew cab and the 63 Uni over tomorrow and get them positioned and then take the 63 F250 over later this week for brakes, then it will come back to the house garage and we'll take the 61 BBW Uni over to get in line on the project list.
First order of business will be to remove the front clip and the bed from the crew cab so I can see what I have to deal with. As I've upped the anti by committing to driving my crew cab to SlickStock V I've got to get to some serious work.
First priority is to finish up the 63 Uni and get it drivable and stoppable, breaks on the f250 so it's stoppable and then on to the crew. For the first time I will be able to move from project to project without having to move something out of the garage and move something in. I'm close to a deal so I'll have convenient access to a fork lift which will aid in removing beds, cabs, etc.
And did I say that it's air conditioned and heated? And the utilities are included in the rent?
It's been a lot of work and has taken much longer than I had anticipated, but I now have a really nice. well-equipped shop and now have no excuses not to get busy and get these projects going. Then I can buy more Slicks.
I am one lucky son-of-a-gun.
Stay tuned for details on the upcoming "Shop Warming" a little later on in the year, when hopefully, the weather cools a bit. Y'all come!